River City Phase II
(Moss Park)
Developer | Urban Capital/Waterfront Toronto |
---|---|
Price Range | $257,900 - $669,900 |
Move In | |
Maintenance | Info not yet available |
Floors | Info not yet available |
Units | 240 |
TREB District | C08 - Moss Park |
Intersection | Info not yet available |
Architects | Saucier + Perrotte |
Interior designers | Saucier + Perrotte |
Status | Preconstruction |
Building type | Info not yet available |
Price/ sqft | $501.55 |
Parking | Info not yet available |
Comments | Info not yet available |
End user profile | Info not yet available |
Request More Info
Project Summary
River City Phase II is one of four new River City condominium projects in Toronto by Urban Capital Property Group and Waterfront Toronto, and winner of BILD's 2010 Best Design Award. River City Phase II will consist of three glass mini-towers connected on each floor via glass bridges.
Project Ammenities
- billiards room
- yoga/meditation area
- movie theatre
- hybrid car and bike share program
- shared outdoor facilities with Phase I include:
- outdoor heated pool on a floating deck
- landscaped courtyard
- outdoor private dining area/lounge
Loading map...
Features
Appliances- stainless steel appliances include:
- all-in-one condensing washer/dryer
- frost free refridgerator
- self-cleaning slide-in stove
- dishwasher
- over-the-range microwave
- Floors:
- living area and bedroom - environmentally sustainable engineered hardwood
- bathroom - ceramic tile
- Kitchen:
- island where applicable
- stone countertops
- backpainted glass backsplash with custom valence lighting
- single undermount stainless steel sink
- track lighting
- Bathroom:
- back-lit medicine cabinet
- temperature controlled valves in showers
- full height tile surrounds for shower and bathtub
- stone countertop
- Plus:
- in-suite service panel with breakers
- smoke and heat detectors
- floor to ceiling windows
- individually metered units
- 24 hour concierge located in Phase I lobby and accessibly by videophone in Phase II lobby, Enterphones in all lobby vestibules, electric fob based access system
- Toronto's first LEED Gold/Carbon Neutral residential development
- full Tarion Warranty Protection
- energy efficient year-round heating/cooling systems
- use of energy recovery ventilators (ERVs)
- energy efficient appliances
- dual flush toilets
- water efficient faucets and showerheads
- on-site recycling system
- use of green roofs and rainwater storage system